Yes, VWO Surveys can be scheduled to run at a certain date and time. To set the scheduling, go to the Advanced Options section and select the Enable Scheduling option to configure the scheduling criteria.
To learn more about scheduling a test in VWO, refer to How to Schedule Your VWO Test.
Comments
0 comments
Please sign in to leave a comment.